Emergency Temporary Closure of Park Road, Stevington

This emergency temporary road closure is anticipated to be in operation 17th August 2022 to 4th September 2022

Date Published: 18/08/2022


This emergency temporary road closure is anticipated to be in operation 22nd August to 4th September 2022 for 24 hours per day for the duration of this period of time or until the works are complete.  This temporary road closure is required to facilitate repairs to the  railway bridge and  is required for the safety of the public and workforce while Network Rail Infrastructure Ltd  undertakes these works and shall apply to such extent as may from time to time be indicated by the appropriate traffic signs. 

The signed alternative route  for vehicles affected by the order  is available via

Highfield Road, Paula Radcliffe Way, Bedford Road, Radwell Road, Bridge End, Felmersham Road, The High Road, Grange Road, Pavenham Road, Church Lane, High Street 

The reverse route applies

  

Please click on the following link https://one.network/?tm=129169410  to view  details of the closure

For further information please contact 

Hatton Traffic Management  on behalf of Network Rail

24 hour contact number . Michael Ridley - 07387 107815