Emergency Temporary Closure of Bedford Road, Pavenham

This emergency temporary road closure is anticipated to be in operation 10th June 2021 onwards until the works are complete

Date Published: 10/06/2021

ROAD TRAFFIC REGULATION ACT 1984 - SECTION 14(2)

Emergency Temporary Closure of Bedford Road, Pavenham 2021-24

Length Affected: approx 150m south from stafford doors                                   

This emergency temporary road closure is anticipated to be in operation 10th June 2021 onwards until the works are complete.  This temporary road closure is required to carry out repairs to the carriageway surface due to safety concerns to road users and  is required for the safety of the public and workforce while Bedford Borough Council undertakes repairs and shall apply to such extent as may from time to time be indicated by the appropriate traffic signs. 

The signed alternative route  for vehicles affected by the order  is available via:

Bedford Road, Pavenham Road, Highfield Road, Paula Radcliffe Way, Rushden Road, Radwell Road, Bridge End, Felmersham Road, The High Road, Grange Road, Church Lane, High Street 

The reverse route applies

Please click on the following linkhttps://one.network/?tm=122473323to view  details of the closure

Contact: 
Bedford Borough Council  Tel:  01234 718003